Expanding
Colocation
Liquid cooling
Tier III

CyrusOne SAT San Antonio

CyrusOne (KKR) · San Antonio

IT live
32 MW
Free to lease
3.8 MW
$ / kW·mo
$60
White space
288k ft²

Inventory

88% occupied

Power

32 MWlive

3.8 MW to lease · 28.2 MW in use

White space

288k ft²total

18k ft² free · 270k ft² occupied

27k m² · 1,715 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live32 MW
Free to lease3.8 MW
Utility feed60 MW
Campus / planned48 MW

About 28 MW of the utility feed is cooling, conversion, and house load.

Power cost

$60/kW·mo

6.4¢ industrial · 8.2¢ after PUE 1.28

Per MW·year
$718k
This site · 32 MW
$23M/yr
16 kW rack
$957/mo
3.2¢ cheapdear 22.4¢

2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

ERCOT South · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2010
Renewable match
45%
Rack density
16 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

16 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

San Antonio, Texas, United States

San Antonio, TX

29.424°, -98.494° · North America

Tenants / users

Hyperscale, cloud, federal

Notes

San Antonio campus in the 2025 ABS pool with Sterling and Houston-era halls. ERCOT South.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.