CyrusOne PHX Chandler
CyrusOne (KKR) · PHX1-PHX8
- IT live
- 72 MW
- Free to lease
- 8.6 MW
- $ / kW·mo
- $78
- White space
- 536k ft²
Inventory
88% occupiedPower
72 MWlive
8.6 MW to lease · 63.4 MW in use
White space
536k ft²total
31k ft² free · 505k ft² occupied
50k m² · 2,867 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 78 MW of the utility feed is cooling, conversion, and house load.
Power cost
$78/kW·mo
8.4¢ industrial · 10.8¢ after PUE 1.28
- Per MW·year
- $942k
- This site · 72 MW
- $68M/yr
- 25 kW rack
- $1,962/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $42M/yr less.
APS Chandler · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2014
- Renewable match
- 45%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- APS / SRP. Dual 69 kV inlets. Desert dry-cooler campus.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop dry coolers / adiabatic. Water-light desert or zero-WUE design.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Chandler, Arizona, United States
2335 South Ellis Street, Chandler, AZ
33.298°, -111.841° · North America
Tenants / users
Hyperscale, cloud
Notes
Multi-building Chandler campus (PHX1-PHX8). Water-light dry coolers. Phoenix wholesale alternative to EdgeConneX.