CyrusOne NYM1 Somerset
CyrusOne (KKR) · Somerset
- IT live
- 22 MW
- Free to lease
- 2.6 MW
- $ / kW·mo
- $82
- White space
- 156k ft²
Inventory
88% occupiedPower
22 MWlive
2.6 MW to lease · 19.4 MW in use
White space
156k ft²total
15k ft² free · 141k ft² occupied
15k m² · 1,394 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 5.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$82/kW·mo
8.8¢ industrial · 11.3¢ after PUE 1.28
- Per MW·year
- $987k
- This site · 22 MW
- $22M/yr
- 12 kW rack
- $987/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
PSEG / PJM · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2012
- Renewable match
- 30%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- PSEG / PJM. Dual 13 kV or 26 kV. New Jersey.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Somerset, New Jersey, United States
800 Cottontail Lane, Somerset, NJ
40.540°, -74.525° · North America
Tenants / users
Enterprise, NY metro wholesale
Notes
New Jersey NY-metro wholesale. Not a Manhattan carrier hotel. Complements Equinix NY.