Operational
Colocation
Liquid cooling
Tier III

CyrusOne NYM1 Somerset

CyrusOne (KKR) · Somerset

IT live
22 MW
Free to lease
2.6 MW
$ / kW·mo
$82
White space
156k ft²

Inventory

88% occupied

Power

22 MWlive

2.6 MW to lease · 19.4 MW in use

White space

156k ft²total

15k ft² free · 141k ft² occupied

15k m² · 1,394 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live22 MW
Free to lease2.6 MW
Utility feed27.5 MW
Campus / planned22 MW

About 5.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$82/kW·mo

8.8¢ industrial · 11.3¢ after PUE 1.28

Per MW·year
$987k
This site · 22 MW
$22M/yr
12 kW rack
$987/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.

PSEG / PJM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2012
Renewable match
30%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
PSEG / PJM. Dual 13 kV or 26 kV. New Jersey.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Somerset, New Jersey, United States

800 Cottontail Lane, Somerset, NJ

40.540°, -74.525° · North America

Tenants / users

Enterprise, NY metro wholesale

Notes

New Jersey NY-metro wholesale. Not a Manhattan carrier hotel. Complements Equinix NY.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.