CyrusOne NVA5 Sterling
CyrusOne (KKR) · Northern Virginia
- IT live
- 51 MW
- Free to lease
- 6.1 MW
- $ / kW·mo
- $68
- White space
- 266k ft²
Inventory
88% occupiedPower
51 MWlive
6.1 MW to lease · 44.9 MW in use
White space
266k ft²total
26k ft² free · 240k ft² occupied
25k m² · 2,369 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 12.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$68/kW·mo
7.3¢ industrial · 9.3¢ after PUE 1.28
- Per MW·year
- $819k
- This site · 51 MW
- $42M/yr
- 20 kW rack
- $1,364/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.
Northern Virginia / Dominion · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2017
- Renewable match
- 50%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sterling, Virginia, United States
21350 Pacific Blvd, Sterling, VA
39.006°, -77.429° · North America
Tenants / users
Hyperscale, cloud, federal
Notes
Flagship Sterling hall in the 2025 ABS pool. Complements the catalog's Dallas DFW1. Dual Dominion feeds.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.