Expanding
Colocation
Liquid cooling
Tier III

CyrusOne DFW3 Allen

CyrusOne (KKR) · Allen

IT live
32 MW
Free to lease
3.8 MW
$ / kW·mo
$62
White space
260k ft²

Inventory

88% occupied

Power

32 MWlive

3.8 MW to lease · 28.2 MW in use

White space

260k ft²total

16k ft² free · 244k ft² occupied

24k m² · 1,486 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live32 MW
Free to lease3.8 MW
Utility feed62.5 MW
Campus / planned50 MW

About 30.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$62/kW·mo

6.6¢ industrial · 8.4¢ after PUE 1.28

Per MW·year
$740k
This site · 32 MW
$24M/yr
20 kW rack
$1,233/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

ERCOT North · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2018
Renewable match
40%
Rack density
20 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Indirect evaporative plus DX trim. Zero-WUE option on newer halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Allen, Texas, United States

2300 Chelsea Blvd, Allen, TX

33.103°, -96.671° · North America

Tenants / users

Hyperscale, cloud

Notes

Allen campus with DFW3/4/5. Water-free cooling. Distinct from Carrollton DFW1 already in the index.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.