CyrusOne AMS1 Halfweg
CyrusOne · PolanenPark
- IT live
- 28 MW
- Free to lease
- 2.5 MW
- $ / kW·mo
- $144
- White space
- 325k ft²
Inventory
91% occupiedPower
28 MWlive
2.5 MW to lease · 25.5 MW in use
White space
325k ft²total
12k ft² free · 312k ft² occupied
30k m² · 1,126 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 39.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$144/kW·mo
15.4¢ industrial · 19.7¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 28 MW
- $48M/yr
- 16 kW rack
- $2,302/mo
4.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $38M/yr less.
Haarlem / Liander · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 100%
- Rack density
- 16 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Halfweg, North Holland, Netherlands
Linieweg 1, 1165 AA Halfweg
52.382°, 4.755° · Europe
Tenants / users
Hyperscale, cloud, wholesale
Notes
Two buildings, 29,350 sqm / 54 MW campus on SADC PolanenPark, 15 km west of the ring. First hall 2021. Building 2 planned. Complements Goodman AMS01 next door.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.