CtrlS Bhubaneswar
CtrlS · Bhubaneswar
- IT live
- 6 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $89
- White space
- 42k ft²
Inventory
82% occupiedPower
6 MWlive
1.1 MW to lease · 4.9 MW in use
White space
42k ft²total
7,500 ft² free · 34k ft² occupied
3,871 m² · 697 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 9 MW of the utility feed is cooling, conversion, and house load.
Power cost
$89/kW·mo
8.8¢ industrial · 12.1¢ after PUE 1.38
- Per MW·year
- $1.1M
- This site · 6 MW
- $6.4M/yr
- 8 kW rack
- $709/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.1M/yr less.
TPCODL · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 30%
- Rack density
- 8 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- TPCODL plus on-site generators.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH. Tropical wet-bulb limits evaporative; liquid-ready high-density cages on newer halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bhubaneswar, Odisha, India
Bhubaneswar, Odisha
20.296°, 85.824° · Asia
Tenants / users
Enterprise, government, cloud
Notes
CtrlS Odisha. Disaster-recovery pair for Kolkata and Hyderabad.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.