CSC LUMI Kajaani
CSC / EuroHPC · Kajaani

- IT live
- 10 MW
- Remaining
- 10 MW
- $ / kW·mo
- $44
- White space
- 63k ft²
Inventory
50% occupiedPower
20 MWcampus
10 MW to commission · 10 MW in use
White space
125k ft²total
63k ft² free · 63k ft² occupied
12k m² · 5,806 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 15 MW of the utility feed is cooling, conversion, and house load.
Power cost
$44/kW·mo
5.8¢ industrial · 6¢ after PUE 1.04
- Per MW·year
- $528k
- This site · 10 MW
- $5.3M/yr
- 40 kW rack
- $1,761/mo
1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.
Finland Hamina / Kymenlaakso · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 100%
- Rack density
- 40 kW
- PUE
- 1.041.00 ideal · 1.60 typical
- Power source
- Fingrid. Dual feeds. Nuclear (Olkiluoto 3) plus hydro and wind.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip on LUMI-G AMD GPU partition. Waste heat to Kajaani district heating.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kajaani, Kainuu, Finland
CSC data center, Kajaani
64.228°, 27.729° · Europe
Tenants / users
EuroHPC, research, LUMI-C / LUMI-G
Notes
EuroHPC pre-exascale. One of the most efficient supercomputers (Green500). Captive research hall, not multi-tenant colo. Kainuu hydro.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.