Crusoe Childress Campus
Crusoe · Childress
- Planned IT
- 1.4 GW
- Remaining
- 1.4 GW
- $ / kW·mo
- $56
- White space
- 2.8M ft²
Inventory
0% occupiedPower
1.4 GWcampus
1.4 GW pipeline · 0 MW in use
White space
2.8M ft²total
2.8M ft² free · — occupied
260k m² · 260k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$56/kW·mo
6.6¢ industrial · 7.7¢ after PUE 1.16
- Per MW·year
- $671k
- This site · 1.4 GW
- $939M/yr
- 120 kW rack
- $6,707/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $484M/yr less.
ERCOT industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 60%
- Rack density
- 120 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- ERCOT West plus behind-the-meter generation.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
120 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-cooled GPU halls designed for 100 kW+ racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Childress, Texas, United States
Childress County, TX
34.426°, -100.205° · North America
Tenants / users
Crusoe customers
Notes
1.4 GW AI factory campus in the Texas Panhandle.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.