Under construction
Neocloud
Liquid cooling
Tier III

Crusoe Childress Campus

Crusoe · Childress

Planned IT
1.4 GW
Remaining
1.4 GW
$ / kW·mo
$56
White space
2.8M ft²

Inventory

0% occupied

Power

1.4 GWcampus

1.4 GW pipeline · 0 MW in use

White space

2.8M ft²total

2.8M ft² free · occupied

260k m² · 260k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining1.4 GW
Utility feed
Campus / planned1.4 GW

Power cost

$56/kW·mo

6.6¢ industrial · 7.7¢ after PUE 1.16

Per MW·year
$671k
This site · 1.4 GW
$939M/yr
120 kW rack
$6,707/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $484M/yr less.

ERCOT industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
60%
Rack density
120 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
ERCOT West plus behind-the-meter generation.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

120 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Liquid-cooled GPU halls designed for 100 kW+ racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Childress, Texas, United States

Childress County, TX

34.426°, -100.205° · North America

Tenants / users

Crusoe customers

Notes

1.4 GW AI factory campus in the Texas Panhandle.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.