CoreWeave Lancaster
CoreWeave
- Planned IT
- 100 MW
- Remaining
- —
- $ / kW·mo
- $70
- White space
- —
Inventory
0% occupiedPower
100 MWcampus
0 MW pipeline · 0 MW in use
White space
—total
— free
—
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$70/kW·mo
7.4¢ industrial · 9.6¢ after PUE —
- Per MW·year
- $843k
- This site · 100 MW
- $84M/yr
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $48M/yr less.
Duquesne / PJM · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lancaster, Pennsylvania, United States
40.038°, -76.306° · North America
Tenants / users
CoreWeave
Notes
CoreWeave intends to commit more than USD 6B to equip a new AI data center in Lancaster: initial 100 MW, potential to expand to 300 MW; about 600 construction jobs and 70 to 175 permanent roles (CoreWeave, Jul 15 2025). Typed planned; construction stage not verified. Coordinates: OSM relation 3997756 (town center, approximate). Sources: https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx
Compiled from public filings, operator pages, and reporting. Not an official operator specification.