CoreWeave Kenilworth
CoreWeave · Northeast Science & Technology Center (NEST)
- Planned IT
- 250 MW
- Remaining
- —
- $ / kW·mo
- $146
- White space
- —
Inventory
0% occupiedPower
250 MWcampus
0 MW pipeline · 0 MW in use
White space
—total
— free
—
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$146/kW·mo
15.4¢ industrial · 20¢ after PUE —
- Per MW·year
- $1.8M
- This site · 250 MW
- $438M/yr
4.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $347M/yr less.
PSEG / NYISO · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kenilworth, New Jersey, United States
11 NEST, Galloping Hill Road, Kenilworth, NJ (former Merck campus)
40.677°, -74.287° · North America
Tenants / users
CoreWeave
Notes
Conversion of the 280,000 sq ft 11 NEST building into CoreWeave's first New Jersey data center (lease announced Oct 28 2024); CoreWeave later bought the building and 27 adjacent acres. Construction started on the roughly USD 1.8B, planned 250 MW project with a USD 250M NJ EDA tax credit (Real Estate NJ). Coordinates: OSM relation 170508 (town center, approximate). Sources: https://www.prnewswire.com/news-releases/coreweave-signs-280-000-sf-lease-at-onyx-and-machines-northeast-science--technology-center-in-kenilworth-302289222.html ; https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.