Under construction
Neocloud
Air cooled

CoreWeave Kenilworth

CoreWeave · Northeast Science & Technology Center (NEST)

Planned IT
250 MW
Remaining
—
$ / kW·mo
$146
White space
—

Inventory

0% occupied

Power

250 MWcampus

0 MW pipeline · 0 MW in use

White space

—total

— free

—

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining—
Utility feed—
Campus / planned250 MW

Power cost

$146/kW·mo

15.4¢ industrial · 20¢ after PUE —

Per MW·year
$1.8M
This site · 250 MW
$438M/yr
3.2¢ cheapdear 22.4¢

4.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $347M/yr less.

PSEG / NYISO · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kenilworth, New Jersey, United States

11 NEST, Galloping Hill Road, Kenilworth, NJ (former Merck campus)

40.677°, -74.287° · North America

Tenants / users

CoreWeave

Notes

Conversion of the 280,000 sq ft 11 NEST building into CoreWeave's first New Jersey data center (lease announced Oct 28 2024); CoreWeave later bought the building and 27 adjacent acres. Construction started on the roughly USD 1.8B, planned 250 MW project with a USD 250M NJ EDA tax credit (Real Estate NJ). Coordinates: OSM relation 170508 (town center, approximate). Sources: https://www.prnewswire.com/news-releases/coreweave-signs-280-000-sf-lease-at-onyx-and-machines-northeast-science--technology-center-in-kenilworth-302289222.html ; https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/

Operator site