CoreSite SV9 Santa Clara
CoreSite · Silicon Valley

- IT live
- 34 MW
- Free to lease
- 1.7 MW
- $ / kW·mo
- $162
- White space
- 142k ft²
Inventory
95% occupiedPower
34 MWlive
1.7 MW to lease · 32.3 MW in use
White space
142k ft²total
7,083 ft² free · 135k ft² occupied
13k m² · 658 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$162/kW·mo
17.8¢ industrial · 22.3¢ after PUE 1.25
- Per MW·year
- $1.9M
- This site · 34 MW
- $66M/yr
- 20 kW rack
- $3,249/mo
5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.
PG&E Silicon Valley · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 60%
- Rack density
- 20 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- PG&E or LADWP depending on campus.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-ready high-density cabinets with CDU manifolds and rear-door / direct-to-chip options on the Open Cloud Exchange campus.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santa Clara, California, United States
2915 Stender Way, Santa Clara, CA 95054
37.376°, -121.962° · North America
Tenants / users
Networks, cloud on-ramps, enterprise — Open Cloud Exchange
Notes
Largest CoreSite Silicon Valley building at 34 MW / 228k sq ft. Designed for high-density cloud and AI colo. American Tower–owned CoreSite. Campus 228,000 sq ft.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.