Under construction
Colocation
Liquid cooling
Tier III

CoreSite NY4 Secaucus

CoreSite · New York

Planned IT
16 MW
Free to lease
12.8 MW
$ / kW·mo
$141
White space
67k ft²

Inventory

20% occupied

Power

16 MWlive

12.8 MW to lease · 3.2 MW in use

White space

67k ft²total

53k ft² free · 13k ft² occupied

6,194 m² · 4,955 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease12.8 MW
Utility feed
Campus / planned16 MW

Power cost

$141/kW·mo

15.4¢ industrial · 19.3¢ after PUE 1.25

Per MW·year
$1.7M
This site · 16 MW
$27M/yr
20 kW rack
$2,811/mo
3.2¢ cheapdear 22.4¢

4.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $21M/yr less.

PSEG / NYISO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
30%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Con Edison / PSEG.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Liquid-ready high-density cabinets with CDU manifolds and rear-door / direct-to-chip options on the Open Cloud Exchange campus.

Network carriers

8

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Secaucus, New Jersey, United States

215 County Avenue, Secaucus, NJ 07094

40.791°, -74.063° · North America

Tenants / users

Networks, cloud on-ramps, enterprise — Open Cloud Exchange

Notes

Secaucus expansion building, 132k sq ft. High-density / liquid-ready design. American Tower–owned CoreSite. Campus 132,000 sq ft.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.