CoreSite NY2 Secaucus
CoreSite · New York

- IT live
- 16.5 MW
- Free to lease
- 1.5 MW
- $ / kW·mo
- $146
- White space
- 94k ft²
Inventory
91% occupiedPower
16.5 MWlive
1.5 MW to lease · 15.0 MW in use
White space
94k ft²total
8,466 ft² free · 85k ft² occupied
8,710 m² · 787 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 5.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$146/kW·mo
15.4¢ industrial · 20¢ after PUE 1.30
- Per MW·year
- $1.8M
- This site · 16.5 MW
- $29M/yr
- 12 kW rack
- $1,754/mo
4.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.
PSEG / NYISO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 30%
- Rack density
- 12 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- Con Edison / PSEG.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-ready high-density cabinets with CDU manifolds and rear-door / direct-to-chip options on the Open Cloud Exchange campus.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Secaucus, New Jersey, United States
2 Emerson Lane, Secaucus, NJ 07094
40.787°, -74.070° · North America
Tenants / users
Networks, cloud on-ramps, enterprise — Open Cloud Exchange
Notes
Purpose-built Tier III above the 500-year flood plain. 16.5 MW published. Dark-fiber to NY1 in Manhattan. American Tower–owned CoreSite. Campus 256,000 sq ft.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.