CoreSite DA1 Irving
CoreSite · Dallas
- Planned IT
- 24 MW
- Free to lease
- 24 MW
- $ / kW·mo
- $59
- White space
- 75k ft²
Inventory
0% occupiedPower
24 MWlive
24 MW to lease · 0 MW in use
White space
75k ft²total
75k ft² free · — occupied
6,968 m² · 6,968 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$59/kW·mo
6.6¢ industrial · 8.1¢ after PUE 1.22
- Per MW·year
- $705k
- This site · 24 MW
- $17M/yr
- 30 kW rack
- $1,763/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.7M/yr less.
ERCOT industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 30%
- Rack density
- 30 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- Oncor / ERCOT.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-ready high-density cabinets with CDU manifolds and rear-door / direct-to-chip options on the Open Cloud Exchange campus.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Irving, Texas, United States
2701 E. Grauwyler Road, Irving, TX 75061
32.831°, -96.939° · North America
Tenants / users
Networks, cloud on-ramps, enterprise — Open Cloud Exchange
Notes
First CoreSite Texas campus. 230k sq ft two-story building filed with TDLR; construction 2027–2028. Campus could grow to three buildings. American Tower–owned CoreSite. Campus 230,000 sq ft.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.