CoreSite CH1 LaSalle
CoreSite · Chicago

- IT live
- 18 MW
- Free to lease
- 2.3 MW
- $ / kW·mo
- $80
- White space
- 125k ft²
Inventory
87% occupiedPower
18 MWlive
2.3 MW to lease · 15.7 MW in use
White space
125k ft²total
16k ft² free · 109k ft² occupied
12k m² · 1,510 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$80/kW·mo
8.1¢ industrial · 11¢ after PUE 1.36
- Per MW·year
- $965k
- This site · 18 MW
- $17M/yr
- 8 kW rack
- $643/mo
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
ComEd · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2007
- Renewable match
- 30%
- Rack density
- 8 kW
- PUE
- 1.361.00 ideal · 1.60 typical
- Power source
- ComEd downtown network, multiple underground feeds.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH / air-cooled interconnection. High-density liquid cabinets are offered on newer CoreSite campus buildings, not this hall.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Chicago, Illinois, United States
427 S. LaSalle Street, Chicago, IL 60605
41.876°, -87.632° · North America
Tenants / users
Networks, cloud on-ramps, enterprise — Open Cloud Exchange
Notes
First purpose-built colo in downtown Chicago. Three underground ComEd feeds. Built to 125 mph wind. Any2 peering adjacency. American Tower–owned CoreSite. Campus 180,000 sq ft.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.