Core Scientific Denton
Core Scientific
- Planned IT
- 260 MW
- Free to lease
- —
- $ / kW·mo
- $63
- White space
- —
Inventory
100% occupiedPower
260 MWlive
0 MW to lease · 260 MW in use
White space
—total
— free
—
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$63/kW·mo
6.6¢ industrial · 8.6¢ after PUE —
- Per MW·year
- $752k
- This site · 260 MW
- $195M/yr
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $101M/yr less.
ERCOT North · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Denton, Texas, United States
33.215°, -97.133° · North America
Tenants / users
CoreWeave
Notes
Core Scientific is converting its Denton site to high-density HPC hosting for CoreWeave; a 70 MW expansion took contracted critical IT to about 260 MW (Core Scientific, Feb 26 2025). Status typed construction (conversion in progress at the time of the release; current stage not verified). Coordinates: OSM relation 115280 (town center, approximate). Source: https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site
Compiled from public filings, operator pages, and reporting. Not an official operator specification.