Compass Datacenters Phoenix
Compass Datacenters · PHX
- IT live
- 48 MW
- Free to lease
- 5.8 MW
- $ / kW·mo
- —
- White space
- 300k ft²
Inventory
88% occupiedPower
48 MWlive
5.8 MW to lease · 42.2 MW in use
White space
300k ft²total
14k ft² free · 286k ft² occupied
28k m² · 1,338 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 72 MW of the utility feed is cooling, conversion, and house load.
Power cost
—/kW·mo
— industrial
- Per MW·year
- —
- This site · 48 MW
- —
Market industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2022
- Renewable match
- 40%
- Rack density
- 40 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- APS / SRP. Dual 69 kV inlets. Desert dry-cooler campus.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop dry coolers / adiabatic. Water-light desert or zero-WUE design.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Phoenix, Arizona, United States
Phoenix, AZ
33.462°, -112.092° · North America
Tenants / users
Hyperscale
Notes
Desert powered-shell campus. Digital Realty acquired Compass in 2024; halls still trade as Compass product.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.