Operational
Colocation
Liquid cooling
Tier III

Compass Datacenters Leesburg

Compass Datacenters · Leesburg

IT live
72 MW
Free to lease
6.5 MW
$ / kW·mo
$67
White space
180k ft²

Inventory

91% occupied

Power

72 MWlive

6.5 MW to lease · 65.5 MW in use

White space

180k ft²total

16k ft² free · 164k ft² occupied

17k m² · 1,505 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live72 MW
Free to lease6.5 MW
Utility feed96 MW
Campus / planned96 MW

About 24 MW of the utility feed is cooling, conversion, and house load.

Power cost

$67/kW·mo

7.3¢ industrial · 9.1¢ after PUE 1.25

Per MW·year
$799k
This site · 72 MW
$58M/yr
40 kW rack
$2,665/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $32M/yr less.

Northern Virginia / Dominion · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2021
Renewable match
20%
Rack density
40 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
NOVEC.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Powered-shell hyperscale with liquid-ready manifolds.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Leesburg, Virginia, United States

Leesburg, Loudoun County, VA

39.116°, -77.564° · North America

Tenants / users

Hyperscale

Notes

Powered-shell model: Compass delivers the building and power, the tenant fits out IT and cooling.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.