Under construction
Colocation
Liquid cooling
Tier III

Compass Datacenters Allen

Compass Datacenters · TX-2 Allen

Planned IT
72 MW
Free to lease
72 MW
$ / kW·mo
—
White space
180k ft²

Inventory

0% occupied

Power

72 MWlive

72 MW to lease · 0 MW in use

White space

180k ft²total

180k ft² free · — occupied

17k m² · 17k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease72 MW
Utility feed—
Campus / planned72 MW

Power cost

—/kW·mo

— industrial

Per MW·year
—
This site · 72 MW
—
3.2¢ cheapdear 22.4¢

Market industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
35%
Rack density
40 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Allen, Texas, United States

Allen, TX

33.114°, -96.662° · North America

Tenants / users

Hyperscale

Notes

Powered-shell hyperscale. Tenant fits out IT and cooling. Complements Compass Leesburg already in the index and CyrusOne DFW3 Allen.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.