Compass Datacenters Allen
Compass Datacenters · TX-2 Allen
- Planned IT
- 72 MW
- Free to lease
- 72 MW
- $ / kW·mo
- —
- White space
- 180k ft²
Inventory
0% occupiedPower
72 MWlive
72 MW to lease · 0 MW in use
White space
180k ft²total
180k ft² free · — occupied
17k m² · 17k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
—/kW·mo
— industrial
- Per MW·year
- —
- This site · 72 MW
- —
Market industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 35%
- Rack density
- 40 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Allen, Texas, United States
Allen, TX
33.114°, -96.662° · North America
Tenants / users
Hyperscale
Notes
Powered-shell hyperscale. Tenant fits out IT and cooling. Complements Compass Leesburg already in the index and CyrusOne DFW3 Allen.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.