Operational
Neocloud
Liquid cooling
Tier III

Colossus 1

SpaceXAI / xAI · Greater Memphis AI Campus

IT live
300 MW
Remaining
0 MW
$ / kW·mo
$63
White space
600k ft²

Inventory

100% occupied

Power

300 MWcampus

0 MW to commission · 300 MW in use

White space

600k ft²total

free · 600k ft² occupied

56k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live300 MW
Remaining0 MW
Utility feed400 MW
Campus / planned300 MW

About 100 MW of the utility feed is cooling, conversion, and house load.

Power cost

$63/kW·mo

7.2¢ industrial · 8.6¢ after PUE 1.20

Per MW·year
$757k
This site · 300 MW
$227M/yr
80 kW rack
$5,046/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $126M/yr less.

MLGW / TVA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
5%
Rack density
80 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
On-site gas turbines and Tesla Megapacks; limited grid interconnection.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

200k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip on Hopper and Blackwell clusters. First 100k-class GPU cluster came online in roughly 122 days.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Memphis, Tennessee, United States

South Memphis / former Electrolux plant

35.145°, -90.052° · North America

Tenants / users

Anthropic, SpaceXAI

Notes

Original Colossus building. Anthropic rented essentially all capacity in May 2026.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.