Cologix MTL8 Scalelogix
Cologix · Saint-Laurent Scalelogix
- IT live
- 21 MW
- Free to lease
- 2.7 MW
- $ / kW·mo
- $41
- White space
- 110k ft²
Inventory
87% occupiedPower
21 MWlive
2.7 MW to lease · 18.3 MW in use
White space
110k ft²total
11k ft² free · 98k ft² occupied
10k m² · 1,057 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 5.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$41/kW·mo
4.9¢ industrial · 5.6¢ after PUE 1.15
- Per MW·year
- $494k
- This site · 21 MW
- $10M/yr
- 20 kW rack
- $823/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.6M/yr less.
Hydro-Québec Rate L / West Island · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 99%
- Rack density
- 20 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Saint-Laurent, Quebec, Canada
7350 Rue Frederick-Banting, Saint-Laurent, QC
45.488°, -73.748° · North America
Tenants / users
Hyperscale, cloud, AI-ready wholesale — LEED Gold
Notes
206,000 sq ft Scalelogix hall. 21 MW. First Canadian colo LEED Gold v4 BD+C Core and Shell (Nov 2025). Purpose-built for Montréal's 55 percent GHG cut by 2030.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.