Cologix MTL10 Longueuil
Cologix · Longueuil
- IT live
- 28 MW
- Free to lease
- 3.6 MW
- $ / kW·mo
- $43
- White space
- 196k ft²
Inventory
87% occupiedPower
28 MWlive
3.6 MW to lease · 24.4 MW in use
White space
196k ft²total
16k ft² free · 180k ft² occupied
18k m² · 1,510 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 16 MW of the utility feed is cooling, conversion, and house load.
Power cost
$43/kW·mo
5¢ industrial · 5.9¢ after PUE 1.18
- Per MW·year
- $517k
- This site · 28 MW
- $14M/yr
- 18 kW rack
- $775/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.2M/yr less.
Hydro-Québec Rate L / South Shore · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 99%
- Rack density
- 18 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Longueuil, Quebec, Canada
530 Rue Bériault, Longueuil, QC J4G 1S8
45.547°, -73.499° · North America
Tenants / users
Hyperscale, Consensus Core GPU cloud, wholesale
Notes
Former Colo-D2. 180,000 sq ft, 35 MW design. Largest single Cologix Montréal hall. Consensus Core NVIDIA GPU-as-a-service on the campus. South-shore dual-site to MTL8.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.