Cologix CGY1 840 7th
Cologix · Downtown Calgary

- IT live
- 0.4 MW
- Free to lease
- 0.1 MW
- $ / kW·mo
- $67
- White space
- 3,906 ft²
Inventory
88% occupiedPower
0.4 MWlive
0.1 MW to lease · 0.4 MW in use
White space
3,906 ft²total
391 ft² free · 3,515 ft² occupied
363 m² · 36 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 0.1 MW of the utility feed is cooling, conversion, and house load.
Power cost
$67/kW·mo
7.2¢ industrial · 9.2¢ after PUE 1.28
- Per MW·year
- $807k
- This site · 0.4 MW
- $323k/yr
- 6 kW rack
- $404/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $179k/yr less.
Alberta AESO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2004
- Renewable match
- 28%
- Rack density
- 6 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- ENMAX / AESO. Dual feeds plus on-site diesel. Gas-marginal Alberta grid.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Canadian free-air hours most of the year. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Calgary, Alberta, Canada
840 7th Avenue SW, Suite 340, Calgary, AB T2P 3G2
51.046°, -114.081° · North America
Tenants / users
YYCIX, 30-plus unique networks, energy, finance
Notes
Calgary's primary carrier hotel. Former DataHiveOne, acquired Sep 2025. 3,700 sq ft, 400 kW, YYCIX home. Interconnection, not a 90 MW Rocky View factory. Completes Cologix's fourth Canadian metro after Montréal, Toronto, Vancouver.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.