Expanding
Colocation
Liquid cooling
Tier III

ClusterPower Bucharest DC2

ClusterPower · Bucharest

IT live
10 MW
Free to lease
1.4 MW
$ / kW·mo
$114
White space
100k ft²

Inventory

86% occupied

Power

10 MWlive

1.4 MW to lease · 8.6 MW in use

White space

100k ft²total

7,000 ft² free · 93k ft² occupied

9,290 m² · 650 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.4 MW
Utility feed20 MW
Campus / planned16 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$114/kW·mo

11.8¢ industrial · 15.6¢ after PUE 1.32

Per MW·year
$1.4M
This site · 10 MW
$14M/yr
15 kW rack
$1,706/mo
3.2¢ cheapdear 22.4¢

3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.9M/yr less.

OPCOM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
55%
Rack density
15 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Transelectrica. Dual 20 kV inlets. Nuclear (Cernavoda), hydro, and wind mix.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bucharest, Bucharest, Romania

Bucharest

44.434°, 26.104° · Europe

Tenants / users

Cloud, HPC, AI colo

Notes

10 MW live, expanding. Largest tracked ClusterPower hall. Cernavoda nuclear on the Romanian mix.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.