Operational
Colocation
Liquid cooling
Tier III

ClusterPower Bucharest DC1

ClusterPower · Bucharest

IT live
8 MW
Free to lease
1.1 MW
$ / kW·mo
$114
White space
57k ft²

Inventory

86% occupied

Power

8 MWlive

1.1 MW to lease · 6.9 MW in use

White space

57k ft²total

6,364 ft² free · 50k ft² occupied

5,279 m² · 591 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.1 MW
Utility feed10 MW
Campus / planned8 MW

About 2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$114/kW·mo

11.8¢ industrial · 15.6¢ after PUE 1.32

Per MW·year
$1.4M
This site · 8 MW
$11M/yr
12 kW rack
$1,364/mo
3.2¢ cheapdear 22.4¢

3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8M/yr less.

OPCOM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
55%
Rack density
12 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Transelectrica. Dual 20 kV inlets. Nuclear (Cernavoda), hydro, and wind mix.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bucharest, Bucharest, Romania

Bucharest

44.432°, 26.102° · Europe

Tenants / users

Cloud, HPC, enterprise

Notes

Romanian HPC/colo operator. DC1 8 MW. Complements NXDATA for Bucharest wholesale.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.