ClusterPower Bucharest DC1
ClusterPower · Bucharest
- IT live
- 8 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $114
- White space
- 57k ft²
Inventory
86% occupiedPower
8 MWlive
1.1 MW to lease · 6.9 MW in use
White space
57k ft²total
6,364 ft² free · 50k ft² occupied
5,279 m² · 591 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$114/kW·mo
11.8¢ industrial · 15.6¢ after PUE 1.32
- Per MW·year
- $1.4M
- This site · 8 MW
- $11M/yr
- 12 kW rack
- $1,364/mo
3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8M/yr less.
OPCOM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 55%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Transelectrica. Dual 20 kV inlets. Nuclear (Cernavoda), hydro, and wind mix.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bucharest, Bucharest, Romania
Bucharest
44.432°, 26.102° · Europe
Tenants / users
Cloud, HPC, enterprise
Notes
Romanian HPC/colo operator. DC1 8 MW. Complements NXDATA for Bucharest wholesale.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.