CloudHQ Queretaro
CloudHQ · Queretaro

- Planned IT
- 360 MW
- Free to lease
- 48 MW
- $ / kW·mo
- $92
- White space
- 171k ft²
Inventory
87% occupiedPower
360 MWlive
48 MW to lease · 312 MW in use
White space
171k ft²total
171k ft² free · — occupied
16k m² · 16k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 360 MW
- $396M/yr
- 25 kW rack
- $2,289/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $266M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 30%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Queretaro
20.589°, -100.390° · North America
Tenants / users
Hyperscale
Notes
Six-hall Queretaro campus. First 200 MW CFE/Cenace interconnection targeted 2H 2027; 360 MW IT design, private 900 MW substation published. Water-light cooling. Construction.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.