Under construction
Colocation
Liquid cooling
Tier III

CloudHQ Queretaro

CloudHQ · Queretaro

CloudHQ Queretaro facility
CloudHQ · Source
Planned IT
360 MW
Free to lease
48 MW
$ / kW·mo
$92
White space
171k ft²

Inventory

87% occupied

Power

360 MWlive

48 MW to lease · 312 MW in use

White space

171k ft²total

171k ft² free · — occupied

16k m² · 16k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease48 MW
Utility feed—
Campus / planned360 MW

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 360 MW
$396M/yr
25 kW rack
$2,289/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $266M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
30%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.589°, -100.390° · North America

Tenants / users

Hyperscale

Notes

Six-hall Queretaro campus. First 200 MW CFE/Cenace interconnection targeted 2H 2027; 360 MW IT design, private 900 MW substation published. Water-light cooling. Construction.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.