Under construction
Colocation
Liquid cooling
Tier III

CloudHQ Chicago Mount Prospect

CloudHQ · ORD

CloudHQ Chicago Mount Prospect facility
CloudHQ · Source
Planned IT
252 MW
Free to lease
252 MW
$ / kW·mo
$74
White space
788k ft²

Inventory

0% occupied

Power

252 MWlive

252 MW to lease · 0 MW in use

White space

788k ft²total

788k ft² free · — occupied

73k m² · 73k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease252 MW
Utility feed—
Campus / planned252 MW

Power cost

$74/kW·mo

8.1¢ industrial · 10.1¢ after PUE 1.25

Per MW·year
$887k
This site · 252 MW
$224M/yr
30 kW rack
$2,217/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $135M/yr less.

ComEd · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
40%
Rack density
30 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
ComEd / PJM. Dual 34.5 kV inlets plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mount Prospect, Illinois, United States

Mount Prospect, IL

42.066°, -87.937° · North America

Tenants / users

Hyperscale, cloud, AI

Notes

Three-building Chicago campus with a dedicated ComEd substation. Project cost reported at 2.5 billion USD. Complements Aligned Northlake.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.