CloudHQ Chicago Mount Prospect
CloudHQ · ORD

- Planned IT
- 252 MW
- Free to lease
- 252 MW
- $ / kW·mo
- $74
- White space
- 788k ft²
Inventory
0% occupiedPower
252 MWlive
252 MW to lease · 0 MW in use
White space
788k ft²total
788k ft² free · — occupied
73k m² · 73k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$74/kW·mo
8.1¢ industrial · 10.1¢ after PUE 1.25
- Per MW·year
- $887k
- This site · 252 MW
- $224M/yr
- 30 kW rack
- $2,217/mo
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $135M/yr less.
ComEd · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 40%
- Rack density
- 30 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- ComEd / PJM. Dual 34.5 kV inlets plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Mount Prospect, Illinois, United States
Mount Prospect, IL
42.066°, -87.937° · North America
Tenants / users
Hyperscale, cloud, AI
Notes
Three-building Chicago campus with a dedicated ComEd substation. Project cost reported at 2.5 billion USD. Complements Aligned Northlake.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.