CloudHQ AMS1 Rozenburg
CloudHQ · Beechavenue
- Planned IT
- 84 MW
- Free to lease
- 84 MW
- $ / kW·mo
- $142
- White space
- 300k ft²
Inventory
0% occupiedPower
84 MWlive
84 MW to lease · 0 MW in use
White space
300k ft²total
300k ft² free · — occupied
28k m² · 28k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$142/kW·mo
15.2¢ industrial · 19.5¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 84 MW
- $143M/yr
- 25 kW rack
- $3,551/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $113M/yr less.
Schiphol-Rijk / Liander · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rozenburg, North Holland, Netherlands
Beechavenue 10, 1437 ED Rozenburg
52.277°, 4.738° · Europe
Tenants / users
Hyperscale, AI wholesale — A4 Zone 150 kV
Notes
Single multi-story 84 MW IT hall south of Schiphol. Power from the new A4 Zone substation. With Switch, the other large published Amsterdam pipeline. Complements CloudHQ Lisses already in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.