Cirion SAO1 Cotia
Cirion · Cotia
- IT live
- 16 MW
- Free to lease
- 2.6 MW
- $ / kW·mo
- $101
- White space
- 174k ft²
Inventory
84% occupiedPower
16 MWlive
2.6 MW to lease · 13.4 MW in use
White space
174k ft²total
18k ft² free · 156k ft² occupied
16k m² · 1,652 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 9 MW of the utility feed is cooling, conversion, and house load.
Power cost
$101/kW·mo
10.8¢ industrial · 13.8¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 16 MW
- $19M/yr
- 8 kW rack
- $807/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
Enel SP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2010
- Renewable match
- 80%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cotia, São Paulo, Brazil
Cotia, Greater São Paulo
-23.604°, -46.919° · South America
Tenants / users
Networks, enterprise, cloud — former Lumen
Notes
Two-building Cotia campus sharing a 20 MW substation. Tier III design and construction. Stonepeak-backed Lumen spin-out. Carrier hotel DNA.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.