Under construction
Colocation
Liquid cooling
Tier III

Cirion RIO2

Cirion · Rio de Janeiro

Planned IT
80 MW
Free to lease
64 MW
$ / kW·mo
$97
White space
333k ft²

Inventory

20% occupied

Power

80 MWlive

64 MW to lease · 16 MW in use

White space

333k ft²total

267k ft² free · 67k ft² occupied

31k m² · 25k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease64 MW
Utility feed
Campus / planned80 MW

Power cost

$97/kW·mo

10.4¢ industrial · 13.3¢ after PUE 1.28

Per MW·year
$1.2M
This site · 80 MW
$93M/yr
20 kW rack
$1,944/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $65M/yr less.

Light · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
70%
Rack density
20 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Light. US$450m expansion of RIO1.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Second Cirion Rio hall, 80 MW, liquid-ready.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rio de Janeiro, Rio de Janeiro, Brazil

Rio de Janeiro, Brazil

-22.906°, -43.180° · South America

Tenants / users

Cloud, networks, enterprise

Notes

Cirion (ex-Lumen LatAm) Rio expansion. Complements Equinix RJ campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.