Cirion RIO2
Cirion · Rio de Janeiro
- Planned IT
- 80 MW
- Free to lease
- 64 MW
- $ / kW·mo
- $97
- White space
- 333k ft²
Inventory
20% occupiedPower
80 MWlive
64 MW to lease · 16 MW in use
White space
333k ft²total
267k ft² free · 67k ft² occupied
31k m² · 25k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 80 MW
- $93M/yr
- 20 kW rack
- $1,944/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $65M/yr less.
Light · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 70%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Light. US$450m expansion of RIO1.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Second Cirion Rio hall, 80 MW, liquid-ready.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rio de Janeiro, Rio de Janeiro, Brazil
Rio de Janeiro, Brazil
-22.906°, -43.180° · South America
Tenants / users
Cloud, networks, enterprise
Notes
Cirion (ex-Lumen LatAm) Rio expansion. Complements Equinix RJ campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.