Cirion RIO1 São Cristóvão
Cirion · São Cristóvão
- IT live
- 12 MW
- Free to lease
- 1.9 MW
- $ / kW·mo
- $97
- White space
- 104k ft²
Inventory
84% occupiedPower
12 MWlive
1.9 MW to lease · 10.1 MW in use
White space
104k ft²total
13k ft² free · 91k ft² occupied
9,677 m² · 1,239 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 12 MW
- $14M/yr
- 8 kW rack
- $777/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.7M/yr less.
Light · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2012
- Renewable match
- 80%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Light SESA. Dual feeds plus on-site diesel. Rio concession.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rio de Janeiro, Rio de Janeiro, Brazil
São Cristóvão, Rio de Janeiro
-22.897°, -43.221° · South America
Tenants / users
Networks, enterprise, subsea
Notes
Cirion's original Rio campus. Pair to Equinix RJ and Ascenty Rio. Light-fed.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.