Operational
Colocation
Air cooled
Tier III

Cirion Quito

Cirion · Quito

IT live
4 MW
Free to lease
0.5 MW
$ / kW·mo
$81
White space
33k ft²

Inventory

88% occupied

Power

4 MWlive

0.5 MW to lease · 3.5 MW in use

White space

33k ft²total

4,000 ft² free · 29k ft² occupied

3,097 m² · 372 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.5 MW
Utility feed5 MW
Campus / planned4 MW

About 1 MW of the utility feed is cooling, conversion, and house load.

Power cost

$81/kW·mo

8.2¢ industrial · 11.1¢ after PUE 1.35

Per MW·year
$970k
This site · 4 MW
$3.9M/yr
5 kW rack
$404/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.

Ecuador hydro · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
70%
Rack density
5 kW
PUE
1.351.00 ideal · 1.60 typical
Power source
Ecuadorian hydro-heavy grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Andean altitude helps free-cooling hours. Air-cooled interconnection.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Quito, Pichincha, Ecuador

Quito, Ecuador

-0.180°, -78.468° · South America

Tenants / users

Networks, enterprise, government

Notes

Quito interconnection for Pacific-Andean routes. Ecuador's principal carrier-neutral hall.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.