Chindata Huailai

Chindata · Huailai

IT live
80 MW
Free to lease
60.2 MW
$ / kW·mo
$70
White space
333k ft²

Inventory

25% occupied

Power

80 MWlive

60.2 MW to lease · 19.8 MW in use

White space

333k ft²total

251k ft² free · 83k ft² occupied

31k m² · 23k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live80 MW
Free to lease60.2 MW
Utility feed188 MW
Campus / planned150 MW

About 108 MW of the utility feed is cooling, conversion, and house load.

Power cost

$70/kW·mo

industrial · 9.6¢ after PUE 1.20

Per MW·year
$841k
This site · 80 MW
$67M/yr
20 kW rack
$1,402/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $40M/yr less.

China industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
40%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hebei free-air economization plus liquid loops on AI halls. Hyperscale campus.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Huailai, Hebei, China

Huailai, Hebei

40.400°, 115.520° · Asia

Tenants / users

Hyperscale, cloud, AI

Notes

Bain-backed Chindata. One of China's largest published hyperscale campuses outside Inner Mongolia.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.