Expanding
Colocation
Liquid cooling
Tier III

Chindata Datong

Chindata · Datong

IT live
60 MW
Free to lease
36.4 MW
$ / kW·mo
$69
White space
250k ft²

Inventory

39% occupied

Power

60 MWlive

36.4 MW to lease · 23.6 MW in use

White space

250k ft²total

152k ft² free · 98k ft² occupied

23k m² · 14k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live60 MW
Free to lease36.4 MW
Utility feed125 MW
Campus / planned100 MW

About 65 MW of the utility feed is cooling, conversion, and house load.

Power cost

$69/kW·mo

industrial · 9.4¢ after PUE 1.18

Per MW·year
$827k
This site · 60 MW
$50M/yr
20 kW rack
$1,378/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.

China industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
40%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Datong, Shanxi, China

Datong, Shanxi

40.090°, 113.300° · Asia

Tenants / users

Hyperscale, cloud

Notes

Shanxi cool-climate hyperscale. Wind-adjacent grid.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.