Operational
Hyperscale
Liquid cooling
Tier III

China Unicom Langfang

China Unicom · Langfang

IT live
50 MW
Remaining
30 MW
$ / kW·mo
$77
White space
284k ft²

Inventory

63% occupied

Power

80 MWcampus

30 MW to commission · 50 MW in use

White space

455k ft²total

170k ft² free · 284k ft² occupied

42k m² · 16k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live50 MW
Remaining30 MW
Utility feed100 MW
Campus / planned80 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$77/kW·mo

8.6¢ industrial · 10.5¢ after PUE 1.22

Per MW·year
$919k
This site · 50 MW
$46M/yr
12 kW rack
$919/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.

Hebei industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
40%
Rack density
12 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Langfang, Hebei, China

Langfang, Hebei

39.500°, 116.680° · Asia

Tenants / users

China Unicom Cloud, government, enterprise

Notes

Unicom Hebei wholesale. Pair to GDS Langfang.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.