Operational
Hyperscale
Liquid cooling
Tier III

China Telecom Inner Mongolia

China Telecom · Hohhot

IT live
80 MW
Remaining
70 MW
$ / kW·mo
$60
White space
400k ft²

Inventory

53% occupied

Power

150 MWcampus

70 MW to commission · 80 MW in use

White space

750k ft²total

350k ft² free · 400k ft² occupied

70k m² · 33k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining70 MW
Utility feed188 MW
Campus / planned150 MW

About 108 MW of the utility feed is cooling, conversion, and house load.

Power cost

$60/kW·mo

6.8¢ industrial · 8.2¢ after PUE 1.20

Per MW·year
$715k
This site · 80 MW
$57M/yr
15 kW rack
$894/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.

Inner Mongolia industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
60%
Rack density
15 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cold-climate free-air plus liquid on AI halls. Wind-rich grid.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hohhot, Inner Mongolia, China

Hohhot, Inner Mongolia

40.840°, 111.750° · Asia

Tenants / users

China Telecom Cloud, government, hyperscale

Notes

China Telecom's Inner Mongolia mega campus. Complements Huawei Horinger in the same metro.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.