Operational
Hyperscale
Liquid cooling
Tier III

China Mobile Gui'an

China Mobile · Gui'an

IT live
60 MW
Remaining
40 MW
$ / kW·mo
$70
White space
300k ft²

Inventory

60% occupied

Power

100 MWcampus

40 MW to commission · 60 MW in use

White space

500k ft²total

200k ft² free · 300k ft² occupied

46k m² · 19k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live60 MW
Remaining40 MW
Utility feed125 MW
Campus / planned100 MW

About 65 MW of the utility feed is cooling, conversion, and house load.

Power cost

$70/kW·mo

industrial · 9.6¢ after PUE 1.20

Per MW·year
$841k
This site · 60 MW
$50M/yr
15 kW rack
$1,051/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.

China industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
55%
Rack density
15 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Guiyang, Guizhou, China

Gui'an New Area, Guizhou

26.400°, 106.650° · Asia

Tenants / users

China Mobile Cloud, government

Notes

China Mobile Guizhou mega campus. Eastern-data-western-compute node.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.