Expanding
Colocation
Air cooled
Tier III

CETIN Belgrade

CETIN · Belgrade

IT live
5 MW
Free to lease
0.7 MW
$ / kW·mo
$119
White space
69k ft²

Inventory

86% occupied

Power

5 MWlive

0.7 MW to lease · 4.3 MW in use

White space

69k ft²total

4,861 ft² free · 65k ft² occupied

6,452 m² · 452 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live5 MW
Free to lease0.7 MW
Utility feed10 MW
Campus / planned8 MW

About 5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$119/kW·mo

12.4¢ industrial · 16.4¢ after PUE 1.32

Per MW·year
$1.4M
This site · 5 MW
$7.2M/yr
8 kW rack
$956/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.3M/yr less.

SEEPEX · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
30%
Rack density
8 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
EMS / EPS. Dual 10 kV. Coal and hydro Serbian grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Belgrade, Belgrade, Serbia

Belgrade

44.787°, 20.449° · Europe

Tenants / users

Networks, enterprise, PTT, cloud

Notes

PPF/CETIN (ex-Telenor infra). Main commercial Belgrade colo. Serbia is the Yugoslav successor hub.