CDC Perth Hazelmere

CDC Data Centres · Perth

Planned IT
192 MW
Free to lease
192 MW
$ / kW·mo
$107
White space
600k ft²

Inventory

0% occupied

Power

192 MWlive

192 MW to lease · 0 MW in use

White space

600k ft²total

600k ft² free · — occupied

56k m² · 56k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease192 MW
Utility feed—
Campus / planned192 MW

Power cost

$107/kW·mo

12.2¢ industrial · 14.6¢ after PUE 1.20

Per MW·year
$1.3M
This site · 192 MW
$246M/yr
30 kW rack
$3,206/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $182M/yr less.

SWIS industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
60%
Rack density
30 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Western Power. Fills the gap after GreenSquare's $1.1bn plan collapsed.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

192 MW proposed campus, liquid-ready.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hazelmere, Western Australia, Australia

Hazelmere, WA

-31.880°, 116.000° · Oceania

Tenants / users

Hyperscale, mining, government

Notes

CDC courting Hazelmere residents for a 192 MW Perth campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.