CDC Perth Hazelmere
CDC Data Centres · Perth
- Planned IT
- 192 MW
- Free to lease
- 192 MW
- $ / kW·mo
- $107
- White space
- 600k ft²
Inventory
0% occupiedPower
192 MWlive
192 MW to lease · 0 MW in use
White space
600k ft²total
600k ft² free · — occupied
56k m² · 56k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$107/kW·mo
12.2¢ industrial · 14.6¢ after PUE 1.20
- Per MW·year
- $1.3M
- This site · 192 MW
- $246M/yr
- 30 kW rack
- $3,206/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $182M/yr less.
SWIS industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 60%
- Rack density
- 30 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Western Power. Fills the gap after GreenSquare's $1.1bn plan collapsed.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
192 MW proposed campus, liquid-ready.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hazelmere, Western Australia, Australia
Hazelmere, WA
-31.880°, 116.000° · Oceania
Tenants / users
Hyperscale, mining, government
Notes
CDC courting Hazelmere residents for a 192 MW Perth campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.