CDC Laverton Campus Two
CDC Data Centres · Melbourne West
- Planned IT
- 300 MW
- Free to lease
- 240 MW
- $ / kW·mo
- $121
- White space
- 938k ft²
Inventory
20% occupiedPower
300 MWlive
240 MW to lease · 60 MW in use
White space
938k ft²total
750k ft² free · 188k ft² occupied
87k m² · 70k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$121/kW·mo
13.8¢ industrial · 16.6¢ after PUE 1.20
- Per MW·year
- $1.5M
- This site · 300 MW
- $435M/yr
- 30 kW rack
- $3,627/mo
4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $334M/yr less.
Victoria NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 70%
- Rack density
- 30 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Powercor. Part of 400+ MW Laverton master plan.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hyperscale wholesale, liquid-ready.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Laverton North, Victoria, Australia
Laverton North, VIC
-37.840°, 144.770° · Oceania
Tenants / users
Hyperscale
Notes
300 MW under construction — among Australia's top-three active builds.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.