Operational
Colocation
Liquid cooling
Tier III

CDC Eastern Creek

CDC Data Centres · Sydney West

IT live
60 MW
Free to lease
7.2 MW
$ / kW·mo
$130
White space
300k ft²

Inventory

88% occupied

Power

60 MWlive

7.2 MW to lease · 52.8 MW in use

White space

300k ft²total

36k ft² free · 264k ft² occupied

28k m² · 3,345 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live60 MW
Free to lease7.2 MW
Utility feed150 MW
Campus / planned120 MW

About 90 MW of the utility feed is cooling, conversion, and house load.

Power cost

$130/kW·mo

14.2¢ industrial · 17.8¢ after PUE 1.25

Per MW·year
$1.6M
This site · 60 MW
$93M/yr
15 kW rack
$1,944/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $72M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
50%
Rack density
15 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Endeavour Energy. Sovereign-cloud certified.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid plus liquid-ready. Heavy federal/sovereign tenant mix.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Eastern Creek, New South Wales, Australia

Eastern Creek, NSW

-33.810°, 150.855° · Oceania

Tenants / users

Australian government, hyperscale

Notes

CDC's Western Sydney campus. Infratil / Future Fund owned.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.