CapitaLand MUM01 Airoli
CapitaLand · Airoli
- IT live
- 22 MW
- Free to lease
- 20.1 MW
- $ / kW·mo
- $95
- White space
- 110k ft²
Inventory
9% occupiedPower
22 MWlive
20.1 MW to lease · 1.9 MW in use
White space
110k ft²total
100k ft² free · 9,700 ft² occupied
10k m² · 9,318 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 34.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$95/kW·mo
10.2¢ industrial · 13.1¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 22 MW
- $25M/yr
- 15 kW rack
- $1,430/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.
MSEDCL · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 30%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- MSEDCL / Tata Power plus on-site generators. Dual utility feeds where available.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Navi Mumbai, Maharashtra, India
Airoli, Navi Mumbai
19.148°, 73.000° · Asia
Tenants / users
Hyperscale, cloud
Notes
CapitaLand's first India DC. Airoli wholesale next to NTT NAV.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.