ByteDance Wuxi

ByteDance · Wuxi

IT live
50 MW
Remaining
30 MW
$ / kW·mo
$70
White space
156k ft²

Inventory

63% occupied

Power

80 MWcampus

30 MW to commission · 50 MW in use

White space

250k ft²total

94k ft² free · 156k ft² occupied

23k m² · 8,710 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live50 MW
Remaining30 MW
Utility feed100 MW
Campus / planned80 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$70/kW·mo

industrial · 9.6¢ after PUE 1.20

Per MW·year
$841k
This site · 50 MW
$42M/yr
30 kW rack
$2,102/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.

China industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
40%
Rack density
30 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Wuxi, Jiangsu, China

Wuxi, Jiangsu

31.490°, 120.310° · Asia

Tenants / users

ByteDance, Doubao, TikTok CN

Notes

ByteDance east China AI/recommendation campus.