Bulk N01 Agder
Bulk Infrastructure · N01
- Planned IT
- 300 MW
- Free to lease
- 300 MW
- $ / kW·mo
- $36
- White space
- 750k ft²
Inventory
0% occupiedPower
300 MWlive
300 MW to lease · 0 MW in use
White space
750k ft²total
750k ft² free · — occupied
70k m² · 70k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$36/kW·mo
4.4¢ industrial · 4.9¢ after PUE 1.12
- Per MW·year
- $432k
- This site · 300 MW
- $130M/yr
- 40 kW rack
- $1,439/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $35M/yr less.
Norway NO2 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 40 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kristiansand, Agder, Norway
Agder, southern Norway
58.160°, 8.018° · Europe
Tenants / users
AI training, hyperscale
Notes
N01 AI campus. 300 MW under construction. Southern-Norway hydro and wind. One of the largest Nordic AI builds this cycle.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.