Under construction
Colocation
Liquid cooling
Tier III

Bulk N01 Agder

Bulk Infrastructure · N01

Planned IT
300 MW
Free to lease
300 MW
$ / kW·mo
$36
White space
750k ft²

Inventory

0% occupied

Power

300 MWlive

300 MW to lease · 0 MW in use

White space

750k ft²total

750k ft² free · occupied

70k m² · 70k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease300 MW
Utility feed
Campus / planned300 MW

Power cost

$36/kW·mo

4.4¢ industrial · 4.9¢ after PUE 1.12

Per MW·year
$432k
This site · 300 MW
$130M/yr
40 kW rack
$1,439/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $35M/yr less.

Norway NO2 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
100%
Rack density
40 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kristiansand, Agder, Norway

Agder, southern Norway

58.160°, 8.018° · Europe

Tenants / users

AI training, hyperscale

Notes

N01 AI campus. 300 MW under construction. Southern-Norway hydro and wind. One of the largest Nordic AI builds this cycle.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.