Bridge MY07 Ulu Tiram
Bridge Data Centres · Ulu Tiram
- Planned IT
- 80 MW
- Free to lease
- 80 MW
- $ / kW·mo
- $71
- White space
- 250k ft²
Inventory
0% occupiedPower
80 MWlive
80 MW to lease · 0 MW in use
White space
250k ft²total
250k ft² free · — occupied
23k m² · 23k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$71/kW·mo
8.3¢ industrial · 9.8¢ after PUE 1.18
- Per MW·year
- $858k
- This site · 80 MW
- $69M/yr
- 30 kW rack
- $2,145/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $42M/yr less.
TNB Johor · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 25%
- Rack density
- 30 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Tenaga Nasional Berhad. Dual 132/275 kV feeds plus on-site generators.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
On-site effluent reuse plant feeds the cooling loop — first inside a Malaysian DC site. Direct-to-chip ready.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ulu Tiram, Johor, Malaysia
Ulu Tiram, Johor
1.597°, 103.812° · Asia
Tenants / users
Hyperscale, AI
Notes
Ulu Tiram campus. Water-treatment plant live Aug 2025 before the halls. CRESS renewable contract with TNB. Targeted live 2027.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.