Expanding
Colocation
Liquid cooling
Tier III

Bridge MY06 Sedenak

Bridge Data Centres · Sedenak Tech Park

IT live
36 MW
Free to lease
7.9 MW
$ / kW·mo
$77
White space
417k ft²

Inventory

78% occupied

Power

36 MWlive

7.9 MW to lease · 28.1 MW in use

White space

417k ft²total

33k ft² free · 384k ft² occupied

39k m² · 3,066 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live36 MW
Free to lease7.9 MW
Utility feed100 MW
Campus / planned80 MW

About 64 MW of the utility feed is cooling, conversion, and house load.

Power cost

$77/kW·mo

8.2¢ industrial · 10.5¢ after PUE 1.28

Per MW·year
$919k
This site · 36 MW
$33M/yr
20 kW rack
$1,532/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.

TNB Johor · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
25%
Rack density
20 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Tenaga Nasional Berhad. Dual 132/275 kV feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kulai, Johor, Malaysia

Sedenak Tech Park, Johor

1.708°, 103.573° · Asia

Tenants / users

Hyperscale, cloud

Notes

Bridge Kidex Sedenak. Bain Capital-backed. One of two operators (with DayOne) that hold most of Johor's live IT.

Operator site