Expanding
Colocation
Liquid cooling
Tier IV

Beyond.pl Poznan DC2

Beyond.pl · Poznan

IT live
32 MW
Free to lease
4.5 MW
$ / kW·mo
$98
White space
219k ft²

Inventory

86% occupied

Power

32 MWlive

4.5 MW to lease · 27.5 MW in use

White space

219k ft²total

19k ft² free · 200k ft² occupied

20k m² · 1,734 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live32 MW
Free to lease4.5 MW
Utility feed52.5 MW
Campus / planned42 MW

About 20.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$98/kW·mo

11.2¢ industrial · 13.4¢ after PUE 1.20

Per MW·year
$1.2M
This site · 32 MW
$38M/yr
20 kW rack
$1,962/mo
3.2¢ cheapdear 22.4¢

3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $27M/yr less.

Enea / Poznan · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2016
Renewable match
100%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Poznan, Greater Poland, Poland

Adama Kreglewskiego 11, Poznan

52.392°, 16.858° · Europe

Tenants / users

Finance, AI/ML, EPIX, Megaport, hyperscale

Notes

42 MW campus. First EU hall with ANSI/TIA-942 Rated 4 plus EN 50600 Class 4. SLA to 99.9999 percent. EPIX node. East-West corridor FRA-POZ-WAW.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.