Beltline Energy Frisco Road
Beltline Energy · I-40 and Frisco Road (Oklahoma City / Yukon)
- Planned IT
- —
- Free to lease
- —
- $ / kW·mo
- $61
- White space
- —
Power
Power cost
$61/kW·mo
6.4¢ industrial · 8.3¢ after PUE —
- Per MW·year
- $729k
- This site
- —
2.0× the cheapest market (Iceland Landsvirkjun).
Oklahoma industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Oklahoma City, Oklahoma, United States
3025 N Frisco Rd and 13921 NW 23rd St, Oklahoma City, OK
35.490°, -97.800° · North America
Notes
Oklahoma City Council approved two PUD rezonings (about 110 acres north and 184 acres south of I-40, west of Frisco Road) 6-3 on Oct 27 2026 for Beltline Energy's roughly USD 15B data center campus, with conditions on water, power and noise (55 dB); further agreements and permits are required before construction. Beltline also holds zoning on adjacent Yukon land (about 480 acres total). Capacity reported variously (up to 1,000 MW per Investigate Midwest via SignalData; 0.5 GW per Yukon in Nov 2025), so left unpublished. Coordinates: I-40/Frisco Road area (approximate). Sources: https://okcfox.com/news/local/once-in-a-century-development-okc-city-council-votes-6-3-to-rezone-land-for-data-center https://www.news9.com/data-centers-in-oklahoma/oklahoma-city-council-approves-rezoning-data-center-project https://okenergytoday.com/2026/01/data-center-wins-rezoning-approval-from-okc-planning-board/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.