Bell AI Fabric Winnipeg
Bell Canada · CentrePort / Rosser
- Planned IT
- 14 MW
- Remaining
- 14 MW
- $ / kW·mo
- $45
- White space
- 35k ft²
Inventory
0% occupiedPower
14 MWcampus
14 MW pipeline · 0 MW in use
White space
35k ft²total
35k ft² free · — occupied
3,252 m² · 3,252 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$45/kW·mo
5.4¢ industrial · 6.2¢ after PUE 1.15
- Per MW·year
- $544k
- This site · 14 MW
- $7.6M/yr
- 40 kW rack
- $1,813/mo
1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.1M/yr less.
Manitoba Hydro · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 98%
- Rack density
- 40 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Manitoba Hydro. Dual feeds. Hydro-heavy Prairie grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rosser, Manitoba, Canada
400 Goldenrod Drive, RM of Rosser, MB
49.954°, -97.273° · North America
Tenants / users
Bell sovereign AI, Canadian telco cloud
Notes
Former Merit Functional Foods protein plant at CentrePort. 14 MW planned. Manitoba Hydro, not AESO. Third Bell AI Fabric province after BC and Saskatchewan. Dual-site with Equinix WI1 Winnipeg colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.