Bell AI Fabric Winnipeg

Bell Canada · CentrePort / Rosser

Planned IT
14 MW
Remaining
14 MW
$ / kW·mo
$45
White space
35k ft²

Inventory

0% occupied

Power

14 MWcampus

14 MW pipeline · 0 MW in use

White space

35k ft²total

35k ft² free · — occupied

3,252 m² · 3,252 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining14 MW
Utility feed—
Campus / planned14 MW

Power cost

$45/kW·mo

5.4¢ industrial · 6.2¢ after PUE 1.15

Per MW·year
$544k
This site · 14 MW
$7.6M/yr
40 kW rack
$1,813/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.1M/yr less.

Manitoba Hydro · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
98%
Rack density
40 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Manitoba Hydro. Dual feeds. Hydro-heavy Prairie grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rosser, Manitoba, Canada

400 Goldenrod Drive, RM of Rosser, MB

49.954°, -97.273° · North America

Tenants / users

Bell sovereign AI, Canadian telco cloud

Notes

Former Merit Functional Foods protein plant at CentrePort. 14 MW planned. Manitoba Hydro, not AESO. Third Bell AI Fabric province after BC and Saskatchewan. Dual-site with Equinix WI1 Winnipeg colo.

Operator site